OPERATING INSTRUCTIONS
EMBLEM
®
GAS-FIRED MULTIPLE BOILER HEATING SYSTEM
Installation and service must be performed by a qualified service installer, service agency or the gas supplier.
THIS MANUAL CONTAINS INFORMATION REQUIRED FOR OPERATION AND MAINTENANCE OF THE EMBLEM
®
GAS-FIRED MULTIPLE BOILER HEATING SYSTEM. REFER TO INDIVIDUAL PRIMERA
®
AND EPV
®
BOILER
INSTALLATION AND MAINTENANCE MANUALS FOR INSTRUCTIONS, WARNINGS AND IMPORTANT INFORMATION
ABOUT THE INSTALLATION, OPERATION AND MAINTENANCE FOR EACH OF THE BOILERS IN THIS HEATING
SYSTEM. READ AND FOLLOW ALL INSTRUCTIONS, MARKINGS AND WARNINGS BEFORE ATTEMPTING TO
START AND OPERATE EITHER BOILER.
TO THE INSTALLER: After installation, these instructions must be given to the equipment user or left near the appliance.
Refer to I & M documents 34-50, 34-501 and 34-502 for additional important information.
SPECIAL INSTRUCTIONS TO THE OWNER: Retain this manual for future reference. These instructions contain
important information that will help you in maintaining and operating this appliance.
CHECKING EQUIPMENT BEFORE YOU INSTALL - Upon receiving equipment, check for signs of shipping damage.
Inspect the appliance and all accompanying parts for signs of impact or mishandling. Verify the total number of pieces
shown on packing slips with those actually received. If there is damage or a shortage, contact the carrier immediately.
WARRANTY - Factory warranty does not cover improper installation or operation. (See individual PRIMERA
®
and EPV
®
boiler warranties for complete details).
Riverside Hydronics
®
, LLC - 990 Haltom Road - Fort Worth, Texas 76117 - Tel 1-800-990-5918
Seitenansicht 0
1 2 3 4 5 6 7 8 9 10

Inhaltsverzeichnis

Seite 1 - OPERATING INSTRUCTIONS

34-500 09/07 1 OPERATING INSTRUCTIONS EMBLEM® GAS-FIRED MULTIPLE BOILER HEATING SYSTEM Installation and service must be performed by a qualified se

Seite 2 - CONTENTS

10LEAD/LAG CONTROL OPTION 3: The EMS performs lead-lag and outdoor reset function by communicating with the TempTrac® control through MODBUS serial

Seite 3 - (Locations May Vary)

EMBLEM® OVERVIEW - The EMBLEM® is a boiler heating system that interconnects a condensing boiler with a non-condensing boiler and uses a control

Seite 4

3ELECTRICAL REQUIREMENTS A single point 30-amp, 240-volt electrical connection and disconnect has been provided to provide electrical service to bot

Seite 5 - system

4OPERATION LOW WATER CUTOFF - Proper function of the low water cutoffs should be verified every six months. See individual boiler Installation &

Seite 6

5SPECIAL DESIGN APPLICATIONS The EMBLEM® boiler system, when used in connection with a refrigeration system, must be installed so the chilled medium

Seite 7

6 Riverside Hydronics®, LLC - 990 Haltom Road - Fort Worth, Texas 76117 - Tel 1-800-990-5918

Seite 8 - Tuesday

7WATER CONSIDERATION WATER CONDITIONING - Every new system will have certain harmful substances which remain in the boiler and piping after construc

Seite 9 - Saturday

8 A Lead/Lag system sequences the on-off firing of multiple boilers to meet the system load demand and equalize run time for all the boilers in a sys

Seite 10 - Riverside Hydronics

9A variation on this example might be to shift back the set point on the weekend in order to reduce loop temperature and save energy beginning 5:00PM